Wade Avenue Project

Project Name

Wade Avenue Project

Location

From I-40 to Blue Ridge Road

Owner

NCDOT

General Contractor

Fred Smith Company

Project Details

​The Wade Avenue Project, managed by NCDOT and executed by Fred Smith Company as the prime contractor, covered a total distance of 3.4 miles, including ramps at Edwards Mill, from I-40 to Blue Ridge Road.

This project was notable for its rapid completion, achieved within two weeks. Fred Smith Company strategically deployed two crews working in opposite directions simultaneously to efficiently mill and fill 13,700 tons of S9.5C asphalt.

Tonnage:

  • Overlay: 13,700 tons of S9.5C for mill/fill operations.

Project Duration:

  • Start to Completion: Completed in just two weeks.

Scope:

  • Mill/Fill: Comprehensive milling and filling of the designated roadway segment.

The project’s efficient execution highlights Fred Smith Company’s expertise in project management and operational coordination, demonstrating their ability to deliver high-quality results under tight schedules.

By improving the Wade Avenue corridor, this project significantly enhanced road quality and safety, benefiting local traffic flow and connectivity. The successful completion of this project underscores Fred Smith Company’s commitment to excellence and their positive impact on the regional transportation network. These improvements contribute to the infrastructure’s durability and support economic growth within the area.

Services Provided

  • Mill/Fill

Services Provided

  • Asphalt Paving & Construction
  • Milling & Resurfacing
  • Curb & Gutter
  • Traffic Striping

Project Details

King Asphalt recently completed the US-123 Road Construction project located in Pickens County, South Carolina. This extensive undertaking aimed to improve the US-123 roadway by implementing various enhancements and upgrades.

The scope of work for this project included the following key tasks:

8” FDP (Full Depth Patching): A total area of 4,200 square yards underwent 8-inch full-depth patching. This process addressed underlying structural issues, ensuring a robust foundation for the subsequent layers of pavement.

2” Milling: Approximately 111,450 square yards of the existing surface were milled down by 2 inches. This step removed the worn-out asphalt layer, creating a smooth base for the upcoming overlay.

Surface C (Leveling & Drives): A total of 812 tons of Surface C materials were used for leveling the roadway and improving driveways. This step contributed to a smoother driving experience and enhanced accessibility for residents and businesses along US-123.

Surface B (Mainline): Approximately 12,259 tons of Surface B materials were utilized for the mainline paving. Surface B is known for its durability and resistance to wear and tear, making it ideal for high-traffic areas.

Borrow: A total of 462 cubic yards of borrow materials were employed to meet project requirements. Borrow materials are often used to supplement existing materials and ensure proper roadbed compaction.

The pavement design for this project consisted of an 8-inch patching layer, 2-inch uniform milling, and a final 220 pounds per square yard (PSY) Hot Mix Asphalt Surface B layer.

To minimize disruption to traffic, the project was exclusively carried out during nighttime hours, with lane closure restrictions in effect from 8 PM to 6 AM. This approach allowed for efficient completion while minimizing inconvenience to motorists.

The US-123 road spans approximately 74 miles in total, with 57.5 miles in South Carolina alone. It serves as a vital connection between Greenville, SC and just west of Toccoa, GA, passing through the city of Clemson, SC. The contracted section of US-123 ran for 2.31 miles through Easley, SC, and included the resurfacing of on/off ramps connecting to SC-153.

Notable features of the project included a four-lane divided highway with a grass median, ten intersections, sixteen commercial drives, and thirty-five residential driveways.

Through the successful completion of the US-123 Road Construction project, King Asphalt has improved the safety, functionality, and overall quality of this significant roadway in Pickens County, South Carolina.